This document itemizes the experiments, attendees and instruments used in the evaluation of the Rossi/Focardi eCat.
I have included links to NyTeknik (English version), because they have reported on every experiment and press release.
See lenr.qumbu.com for information about the eCat and analyses of the published experiments.
Quick links :
1MW
HotCat
QuarkX
Experiment (link to NyTeknik) |
Attended by (link to report) |
Instrument | Provided By | Comments |
---|---|---|---|---|
All | Andrea Rossi | T1,T2,T3 temperature probes, Lab View | Rossi | Temperature, Control of the eCat |
Wattmeter, Clamp Ammeter, Voltmeter | Rossi (1) | Input Power | ||
Radiation Detector SN 018895 |
Focardi/Rossi (1) | Yellow meter, seen in some pictures. | ||
Pumps | Rossi | Calibrated by experimenters | ||
Jan 2011 (Swedish / Wayback) |
Giuseppi Levi | “WATTUP?” Pro Es power meter | Levi? | Power |
0.1g scale | Rossi (1) | Used for H2 delta | ||
Hand meter | Possibly Rossi/Lewan (2) | Shown in picture | ||
Mauro Villa (In Levi report) | NaI(Tl) scintillators | Villa | Gamma | |
David Bianchini (In Levi report) | AUTOMESS 6150 AD-b (s/n 93883) | Bianchini | Gamma | |
LUDLUM 2221 Scaler/Ratemeter SCA | Bianchini | Neutrons | ||
Gilberto Galantini (In Levi report) Declarations | Delta Ohm HD37AB1347 HP474AC probe | Galantini? | Steam Quality (Off-label use?) | |
Testo deprimometer | Galantini? | Pressure | ||
Water column | Galantini | Pressure | ||
Melich | ||||
Maci (looks the same as Melich) | ||||
Francesco Celani (Details, Gamma burst) | Geiger : GEM Radalert II, Perspective Scientific | Celani | Both instruments saturated at start-up | |
Sodium iodide gamma detector (NaI) | Celani | |||
Jacques Dufour | ||||
Feb 2011 (Wayback Machine) |
Levi | Not specified | Rossi | |
Bianchini | per Krivit | |||
Mar 2011 | Hanno Essén, Sven Kullander | Isotope analysis | Uppsala | Sample provided by Rossi -- not from this experiment. |
Giuseppe Levi | ||||
David Bianchini | Radiation (not enumerated) | Bianchini | Presumed to be as above | |
Certified Testo 650, with a probe guaranteed to resist up to 550°C | Unknown. K&E did not bring any instruments. | Steam quality. | ||
April 19, 2011 | Lewan | Temperature logger Testo 177-T3 0554 1765 Usb Interface, Probes | Rossi | |
Automess S/N 95171 Radiation | ||||
Amperemeter Digimaster DM201 1090647637 | Rossi and then Lewan (2) | |||
electromagnetic fields from 5 Hz to 3 GHz | Bianchini(1) | |||
Multimeter | Lewan(1) | |||
April 28 2011 (Same report) |
Lewan | Details same as above | ||
June 14, 2011 | Krivit | None mentioned. | Rossi | This was specifically a demonstration by Rossi, and not an experiment. |
Sep 7, 2011 | Lewan | Temperature logger and scale as above | ||
Clamp Amperemeter Digimaster DM201 1090647637 | Lewan (2) | |||
Clamp Amperemeter Mastech MS2102 AC/DC 10030032671 | Lewan (1) | |||
Multimeter Hung Chang HC-5010C | Lewan (1) | |||
Residual-current device, Co Tech EMP200S-1, Ref 32-3492 | Lewan (1) | |||
Oct 6, 2011 | Roland Pettersson video interview |
No report issued | ||
Lewan | Mostly as above | Rossi | Lewan realized nothing was going to be recorded, so he stepped in. | |
Flow Meter | Rossi | Commercial instrument. Outlet checked occasionally. | ||
Heat exchanger (SWEP E8T-SC-S) | Rossi | |||
Wire thermocouples and 4 channels thermometer Lutron TM-947SD, temperature probe TP-01 | Rossi | Disassembled after test. Ice calibration attempted by Lewan | ||
Electrical | Lewan (1) | |||
Digital bathroom scale | Rossi (1) | To measure eCat weight before and after | ||
(Brian Josephson) | Invited, but could not attend. | |||
Other Tests | ||||
Nov 20, 2009 | Demo to Tony Tether, former director of DARPA. "The input electrical energy to increased heat energy output was 25 (may be off a bit here but nothing that would change the conclusion) and the fact that this was true over many hours negated that some chemical reaction was the cause) ... if it was a hoax, it was a damn good one." New Energy Times | |||
??? | Jed Rothwell says he has talked to people who did a test of a system independent of Rossi, which indicated that it worked. "Yes, they installed all the instruments in their own location. Rossi had nothing to do with it . . . I don’t have much on this. Just a summary, some graphs and 6 photos of equipment. It looks like a standard HVAC boiler test to me. ... It looks like it worked, but I can’t be sure." | |||
??? | Jed also describes an attempted test of the "fatcat" by NASA where the output was blocked. This is probably the test described by Lewan. | |||
1MW System (and IH) | ||||
Feb 1, 2011 | Lewan : Announced | |||
Sep 4, 2011 | Lewan : first view of 1MW container Note : clearly made of 'fatcats' .. but without the extra modules on top. | |||
Oct 28, 2011 | Testo data loggers and probes | Rossi/Customer | "For the customer" | |
It is now known that Darden and Vaughn from Industrial Heat were at the acceptance test. (Possibly "The Customer"). Also note the hotcat under test. |
||||
Early 2012 | "In early 2012, ROSSI and LEONARDO were contacted by Defendants DARDEN, VAUGHN and CHEROKEE, who expressed an interest in licensing the E-Cat IP in the United States of America" | |||
Oct 26, 2012 | "ROSSI and LEONARDO entered into a License Agreement with IH" | |||
May 1, 2013 | IH acceptance test (paid $10M) Three systems tested : A (30-unit 1MW), B (1MW, not for acceptance), C (Hotcat) Documents presumed to exist : Acceptance specification, ERV report. Note: I suspect that all three systems were tested with the same pump/ecat/radiator system as used for the initial 1MW acceptance test. I'm guessing that the Hotcat was the "System 600" in Patent 20140326711 (See Fig 17). |
|||
February 19, 2015 to February 15, 2016 | 1-year "Customer test" Pump array Pump spec Jed Rothwell says he has seen some data from IH, but is not allowed to say what. |
|||
April 7, 2016 | Rossi v IH Lawsuit (with links to lawsuit, contracts, tests) Pacer Index | |||
Hotcat | ||||
Oct 28, 2011 | Visible at 1MW acceptance test. IH's Vaughn seems to be at the hotcat control bench. | |||
July 16th, 2012 Aug 7, 2012 Released Sep 8, 2012 |
Original Penon Report Data Correction (see e-catworld) Revised Penon Report
|
|||
Sep 6, 2012 | A test by the Swedish Technical Research Institute SP failed to replicate the results of the "Penon" tests, because an RMS meter was not used on the previous tests. Swedish (Google Translate) | |||
Oct 9, 2012 | Pordenone report (because it was revealed at a conference there). Final updated calculation 328 hours (218 in SSM), COP 11 (after arbitrary 30% reduction, and ignoring conduction and convection). Refers to the earlier Sep 6 earlier Swedish Test, saying the instrumention had been improved, using a PCE-830 power meter, and controlling the input power with a Variac rather than a Triac. It also says there is an "upcoming 3rd party report" using the same type of Hotcat and instrumentation, which is expected to give similar results (Probably the Nov 2012 Levi test). |
|||
Nov 20, 2102, Dec 13-17, 2012, March 18-23, 2013, Published May 2013 |
Levi Report (Also see Forbes) Nov 2012: the device self-destructed. Dec 2012 : 96 Hours, COP 5.6 Outer was ceramic, coated with commercial aeronautical black paint. Mar 2013: 116 Hours, COP 2.6 (input power included the control electronics). Outer was steel, coated with Macota enamel (but not sprayed uniformly). Callibrated with a dummy run in the operational temperature range (300C). Callibration dots of known emissivity were used. |
|||
May 2-3, 2013 | Test of a Hotcat unit, as part of the IH acceptance test. "Subsequently, a Hot Cat unit shall be tested for a period of 15 hours, as described below. .. Unit B and Hotcat are being tested solely for purposes of further research and development. The Hot Cat unit will be tested 6 p.m. May 2nd - 9 a.m. May 3rd. |
|||
Oct 6, 2014 | Lugano Report 32 Days, half at 1260C COP 3.2, half at 1400C COP 3.6 -- intentionally without SSM mode. The outer cylinder was bare ceramic, raising doubts about emissivity. Callibration dots and a dummy run were used ... but only up to 450C, outside of the operational range. |
|||
April 26, 2014 | US 20140326711 Rossi Patent Application WO/2015/127263 IH/Dameron Patent Application
Device 100 Levi self-destructed Device 200 Levi 96-hours Device 400 Levi 116-hours has flange System 600, 18 Device-400-type reactors, COP=11, uses a water-steam-water loop similar to the 1MW tests (including a generator set). See Fig 17. Guess : System 600 was the hotcat used for the "$10M" acceptance test. |
|||
2013? | The one-year customer test was originally specified to be a "six cylinder ECat". Rossi clarified : "The six cylinders E-Cat is a prototype made by means of 6 Hot Cats." (Question,Answer) | |||
QuarkX | ||||
Dec 27, 2012 | Reference to direct EMF "We surely have already produced direct e.m.f., now we have to develope a real application." Electromotive Force Produced Directly from the Hot Cat | |||
July 14, 2015 | Hotcat "for thermal energy, but we are also experimenting direct energy production" | |||
Aug 7-9, 2015 | Pulsing electrostatic force outside hotcat -- Early official announcement of “M.me Curie” "The result of an enormous R&D, working 16 hours per day." | |||
Mar 18-24, 2016 | Does she also make light? (First question I found referring to direct light output) If your question is aimed to know if the QuarkX makes light, the answer is yes (First explicit answer) | |||
May 16, 2016 | Lewan: Pen-sized QuarkX, produces heat, light, electricity | |||
June 14, 2016 | Report on Internal Test 1mm x 20mm Light, Electricity and Heat output, COP=200 (Clarifications) | |||
Patents | ||||
August 4, 2009 | US 20110005506 METHOD AND APPARATUS FOR CARRYING OUT NICKEL AND HYDROGEN EXOTHERMAL REACTION application | |||
April 26, 2014 |
US 20140326711 Rossi Patent Application WO/2015/127263 IH/Dameron Patent Application
Device 100 Levi self-destructed Device 200 Levi 96-hours Device 400 Levi 116-hours has flange System 600, 18 Device-400-type reactors, COP=11, uses a water-steam-water loop similar to the 1MW tests (including a generator set). See Fig 17. |
Note 1 : From Mats Lewan : Email between Alan Fletcher and Mats Lewan
Note 2 : The multimeter DM 201 was originally provided by Rossi, but Lewan calibrated it against his own multimeter, and then kept it in his possession for all other experiments.
For the January report, Celani emphasizes:
/** All the measurements were made, INDEPENDENTLY, from a Researcher (and Technicians) of Bologna University. Rossi made only supervision about key safety aspects.
*/
The measurement of the internal temperatures T1,T2,T3 were used by Rossi to control the eCat (manually adjusting the resistor power). They were completely under Rossi's control, and are processed by Lab View software, which presumably has the ability to pre-process the displayed values. (And some of which were lost, in the Dec/Jan trials.) Some of these temperatures were cross-checked using other instruments. For example, in January the Bologna team made direct measurements through the top outlet of the eCat.
The Oct 6 setup was special, and Rossi specifically said that it would be done with his thermocouples, but they were examined and calibrated afterwards. The offset between the input and output thermocouples was established by running cold water through the heat exchanger secondary circuit before the Ecat was started.
Oct 28 was entirely by agreement between Rossi and "The Customer". Nobody else was even allowed to photograph any of the instruments.
Personal note : I do not see a large problem with experimenters using standard, stand-alone equipment provided by Rossi -- unless you believe that he tampered with them all. He did not object to any calibrations.
Version 2 : Lewan DID say that the electrical instruments in Oct 6 were his.
Version 4 : University of Bologna Clarifies Relationship With Rossi : "Bianchini is not an employee of our university but a student and should not have used the Department of Physics as his affiliation in writing the safety report." Rossi confirms that Bianchini is a specialist under contract to him. However, his measurements were used ONLY to show that the eCat's radiation was at safe levels. The university also clarified that Levi etc were acting in their private capacity, and not as representatives of the University : " These behaviors are not illicit and do not carry any formal or informal implication on the level of involvement of the University of Bologna on the matter."
This document may be quoted, copied or translated, with the following copyright notice:
© 2011-2016 Alan Fletcher lenr.qumbu.com